CSCS Mock Test For Managers and Professionals

Written By: Ryan - Admin
Updated on: March 6, 2023

Welcome to our Free CSCS Mock Test For Managers and Professionals. If you are working on a construction site in a managerial role, you will have to take this test to get hold of your card, for example, the CSCS Black Managers card and the Academically or Professionally Qualified person cards.

We have included a wide range of questions in this test, there are over 450 questions selected at random to provide you with a 50-question managers CSCS card mock test. So please take this a few times so you can view the different questions and answers.

The managers and professionals CSCS is the same length as the CSCS test for Operatives, it is 45 minutes long, but you will need to score at least 46 out of 50 to pass the exam. There is a larger bank of questions to revise and 3 extra categories to learn:

CSCS Mock Test for Managers and Professionals

If you want to work on a construction site and gain your black card, then you will need to have a good understanding of these questions as you will be asked questions on them in the real exam.

In this mock test, we have provided the latest 50 questions you might be asked when sitting your real CSCS Test. In order to pass your managers and professionals test, you will need to score at least 46 out of 50 correct answers in 45 minutes.

1. Why do most electrical accidents occur? Identify two reasons.
A.
B.
C.
D.
E.
2. What is the most common source of high levels of lead in the atmosphere during demolition work of on old building?
A.
B.
C.
D.
3. Under the Construction (Design and Management) Regulations 2015, who is responsible for providing pre-construction information?
A.
B.
C.
D.
4. You are about to enter an active work area on site. How will you know if you need any extra personal protective equipment (PPE)?
A.
B.
C.
D.
5. How should site-based staff and visitors be informed of the location of first-aid facilities on site?
A.
B.
C.
D.
6. If you see the side supports of an excavation move, what should you do first?
A.
B.
C.
D.
7. Which two of the following will help to minimise dust from stockpiles of soil?
A.
B.
C.
D.
E.
8. Why should white spirit or other solvents not be used to clean hands?
A.
B.
C.
D.
9. When an employer’s first aid needs assessment indicates that a first aider is unnecessary, the minimum requirement is to ensure that there is an appointed person. Which of the following should an appointed person carry out?
A.
B.
C.
D.
10. Breathing in dust whilst using a cutting disc to cut through concrete could result in which of the following diseases?
A.
B.
C.
D.
11. What should someone working from a cherry picker attach their lanyard to?
A.
B.
C.
D.
12. The future use or energy performance of a building or structure can be affected if it is not built correctly. You notice a detail can’t be built as it has been designed. What should you do?
A.
B.
C.
D.
13. The programme of works you are managing has run behind and you will need the site to be operational on a Sunday. The operations will be noisy and there are nearby residents. What action should you take before working?
A.
B.
C.
D.
14. What is the purpose of using a permit to work system?
A.
B.
C.
D.
15. What must you do if you have to enter a hearing protection zone?
A.
B.
C.
D.
16. You when leaving a site you have been visiting you noticed that a contractor is working in an unsafe manner. What should you do?
A.
B.
C.
D.
17. When using portable or pole ladders for access, what is the maximum vertical distance between landings?
A.
B.
C.
D.
18. When do the Construction (Design and Management) Regulations 2015 require an excavation to be inspected by a competent person?
A.
B.
C.
D.
19. What should the worker be provided with if a survey on a remote, unoccupied site needs to be carried out?
A.
B.
C.
D.
20. When planning work on an electrical system, what is the best way to ensure a circuit remains isolated?
A.
B.
C.
D.
21. What is the main danger of leaving someone who has fallen suspended in a harness for too long?
A.
B.
C.
D.
22. While on site you'll see a contractor working in a way that presents and a danger to yourself and others around you. What should you do immediately?
A.
B.
C.
D.
23. What must you remember if you need to wear hearing protection?
A.
B.
C.
D.
24. When can someone who is not a scaffolder adapt an independent scaffold?
A.
B.
C.
D.
25. A supervisor has been working long hours and their quality of work and attention to detail is decreasing. What health condition could they be showing signs of?
A.
B.
C.
D.
26. What should you do first if you find an injured person?
A.
B.
C.
D.
27. To prevent pollution to watercourses what would be the best solution to control surface water run-off from material stockpiles?
A.
B.
C.
D.
28. Noise levels may be a problem, if you have to raise your voice to be understood when someone is standing how far away?
A.
B.
C.
D.
29. If someone is using a disc cutter to cut concrete blocks, what three immediate hazards are likely to affect them?
A.
B.
C.
D.
E.
30. What does the word hazard mean?
A.
B.
C.
D.
31. A plant refuelling point is to be set up on a new site. Which of the following is the preferred method of fuel transfer?
A.
B.
C.
D.
32. Under the Construction (Design and Management) Regulations 2015, what must contractors provide to all workers under their control?
A.
B.
C.
D.
33. If a single vehicle is carrying out mobile highway works during the day, what must be clearly displayed on or at the rear of the vehicle
A.
B.
C.
D.
34. In the colour coding of electrical power supplies on site, what voltage does a blue plug represent?
A.
B.
C.
D.
35. What duty of care documentation should you use for hazardous waste leaving your site?
A.
B.
C.
D.
36. A worker has been asked to move a load that might be too heavy for them. They cannot divide it into smaller parts and there is no-one to help them. What should you do?
A.
B.
C.
D.
37. What should you do if you are working at height, taking site measurements, but the securing cord for a safety net is in your way?
A.
B.
C.
D.
38. The easiest way to the place you want to be on site is through a contractor’s vehicle compound. Which route should you take?
A.
B.
C.
D.
39. Which of the following can provide a good first impression of how well a site is being run?
A.
B.
C.
D.
40. What should you do if a worker tells you that a guard is missing from a power tool?
A.
B.
C.
D.
41. If employees have to work outdoors in bad weather, why should you supply them with waterproof clothing?
A.
B.
C.
D.
42. What is the correct procedure for using a tower crane to offload a lorry?
A.
B.
C.
D.
43. Which of the following is true in relation to the safe working load of a piece of equipment?
A.
B.
C.
D.
44. Under the Construction (Design and Management) Regulations 2015, who must plan, manage and monitor health and safety during the construction phase on projects with more than one contractor?
A.
B.
C.
D.
45. Why is it important for all workers to attend site induction?
A.
B.
C.
D.
46. Which of the following provides the public with adequate protection from falling objects?
A.
B.
C.
D.
47. What can cause occupational dermatitis?
A.
B.
C.
D.
48. What are blue and white signs? M001 General Mandatory Action Sign
A.
B.
C.
D.
49. What is the safest way to use a hazardous substance?
A.
B.
C.
D.
50. Historically which type of accident kills the most construction workers?
A.
B.
C.
D.

 

Whats invloved in the CSCS Test for Managers (MAP)

The CSCS test for managers, also known as the Management and Professional (MAP) Test , is designed to assess an individual's knowledge and understanding of health and safety in the construction industry. The test covers a range of topics, including:

  • General health and safety principles
  • Risk assessment and control measures
  • Fire safety
  • Manual handling
  • Personal protective equipment
  • Working at heights
  • Electrical safety
  • Environmental protection
  • First aid
  • Welfare facilities and provisions
  • Health and safety law

The CSCS test for managers consists of 50 multiple-choice questions, and applicants must answer at least 47 of them correctly to pass the test. The test is taken online, and applicants have 45 minutes to complete it. A CSCS card will be issued to individuals who pass the test, which allows them to work as managers in the construction industry.

Click on a star to rate it!

Average rating 4.7 / 5. 145

No votes so far! Be the first to rate this post.

Why Not Try Out These Tests Next

Leave a Reply to John symons Cancel reply

Your email address will not be published. Required fields are marked *

64 comments on “CSCS Mock Test For Managers and Professionals”

  1. I checked with the official app. The answer to this question is wrong:
    Which two of these activities are likely to need a hot-work permit?

    The correct answer shouldn't include:
    "Refuelling a diesel dump truck"

    1. Hi Dyl

      Thanks for the heads up, you are completely right! Not sure how this got mixed up on the results, but thank you for letting us know. This has now been corrected

  2. Excellent mock test. It helped to emphasize the importance of reading the question

  3. Great help. I want to donate towards this useful service but won't use email banking. If there's any other way to contribute I will certainly.

  4. What a great site. Really helpful in letting you gauge your knowledge level. Especially nice is that you can see where you have gone wrong and learn from mistakes

  5. Shows the importance of reading the questions fully, before answering, and not rushing to finish.

  6. These mock test are a real help, when sitting the test, you are not made aware of why you got a question wrong this is most frustrating not to under stand your error.

  7. it is really helpful
    most of these question are in actual exam
    Thank you

  8. Very good, my revision was based on the 2016 CITB booklet and all the areas of the mock were covered within it. I advise anyone to obtain the latest version of the booklet before attempting this exam.

  9. Q28 28. A. Which of these statements about personal protective equipment (PPE) is not true?
    A. Workers must use it as instructed
    B. Workers must report any damage or loss to their manager
    C. Workers must store it correctly when they are not using it
    D. Workers must pay for any damage or loss
    I answered D and it says I got it wrong?

ConstructionExam.co.uk is not associated or part of any scheme
or organisation such as the CSCS, CPCS or CITB. The only intention of this website is to
provide information about these schemes and their assessments.
? linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram