CSCS Mock Test For Managers and Professionals

Written By: Ryan - Admin
Updated on: March 6, 2023

Welcome to our Free CSCS Mock Test For Managers and Professionals. If you are working on a construction site in a managerial role, you will have to take this test to get hold of your card, for example, the CSCS Black Managers card and the Academically or Professionally Qualified person cards.

We have included a wide range of questions in this test, there are over 450 questions selected at random to provide you with a 50-question managers CSCS card mock test. So please take this a few times so you can view the different questions and answers.

The managers and professionals CSCS is the same length as the CSCS test for Operatives, it is 45 minutes long, but you will need to score at least 46 out of 50 to pass the exam. There is a larger bank of questions to revise and 3 extra categories to learn:

CSCS Mock Test for Managers and Professionals

If you want to work on a construction site and gain your black card, then you will need to have a good understanding of these questions as you will be asked questions on them in the real exam.

In this mock test, we have provided the latest 50 questions you might be asked when sitting your real CSCS Test. In order to pass your managers and professionals test, you will need to score at least 46 out of 50 correct answers in 45 minutes.

1. Why do most electrical accidents occur? Identify two reasons.
A.
B.
C.
D.
E.
2. Which of the following is not an immediate health effect of being exposed to paints and resins which have high levels of solvents?
A.
B.
C.
D.
3. You have to use a new substance for the first time and need to carry out a COSHH assessment. What are the two main things you will need?
A.
B.
C.
D.
E.
4. What action should be taken before using a scaffold which is secured by masonry anchor ties?
A.
B.
C.
D.
5. Which two of the following should be undertaken to help improve a pollution incident response?
A.
B.
C.
D.
E.
6. What should you do if you see this label on a container or packaging? Ghs Explosive
A.
B.
C.
D.
7. When kerbing works are being carried out, how should kerbs be taken off the vehicle?
A.
B.
C.
D.
8. What are round red and white signs with a diagonal line? P001 General Prohibition Sign
A.
B.
C.
D.
9. What does an employer have to prepare a written health and safety policy and record that significant findings of risk assessment?
A.
B.
C.
D.
10. A full 200-litre drum carrying this symbol has toppled over and the whole content has seeped into the ground. Which one of the following agencies should be informed? Ghs Hazardous To The Environment
A.
B.
C.
D.
11. What should you do if you see a large volume of heavy material stored under a tree?
A.
B.
C.
D.
12. A plant refuelling point is to be set up on a new site. Which of the following is the preferred method of fuel transfer?
A.
B.
C.
D.
13. Under environmental law, which statement is true?
A.
B.
C.
D.
14. You notice a build-up of diesel fumes in the area of the site that you are visiting. What should you do?
A.
B.
C.
D.
15. If an assessment has been carried out under the COSHH Regulations who should the risks and control measures be explained to?
A.
B.
C.
D.
16. What is the minimum height of the main guard-rail on a working platform?
A.
B.
C.
D.
17. What illness might you develop if you breathe in dust and fumes over long periods of time?
A.
B.
C.
D.
18. When would you expect eyewash bottles to be provided?
A.
B.
C.
D.
19. If there is a fatal accident or reportable dangerous occurrence on site, when must the Health and Safety Executive be  informed?
A.
B.
C.
D.
20. If you see the side supports of an excavation move, what should you do first?
A.
B.
C.
D.
21. When must employers supply personal protective equipment (PPE)?
A.
B.
C.
D.
22. What should the capacity of a spillage bund around a fuel storage tank be, in addition to the volume of the tank?
A.
B.
C.
D.
23. Where should you find out the number of people who may be carried in a passenger hoist on site?
A.
B.
C.
D.
24. A supervisor has been working long hours and their quality of work and attention to detail is decreasing. What health condition could they be showing signs of?
A.
B.
C.
D.
25. What is one duty of the attendant if you need to work in a confined space?
A.
B.
C.
D.
26. Which statement is true if you need to use a ladder to get to a scaffold platform?
A.
B.
C.
D.
27. What duty of care documentation should you use for hazardous waste leaving your site?
A.
B.
C.
D.
28. Noise levels may be a problem, if you have to raise your voice to be understood when someone is standing how far away?
A.
B.
C.
D.
29. What is the main reason why temporary highways signing needs to be removed when works are completed?
A.
B.
C.
D.
30. Someone has turned up at the site and offered to take your surplus soil away for free. Which of the following is not a legal requirement?
A.
B.
C.
D.
31. What is the purpose of an on site risk assessment?
A.
B.
C.
D.
32. Under the Construction (Design and Management) Regulations 2015, in which of the following situations would a principal contractor need to focus on good contractor co-operation?
A.
B.
C.
D.
33. What must you do if you have to enter a hearing protection zone?
A.
B.
C.
D.
34. How would you expect highly flammable materials to be stored?
A.
B.
C.
D.
35. As part of a feasibility study you are planning an inspection of roof trusses inside a factory building. What is the recommended maximum height for a free-standing mobile tower when used indoors?
A.
B.
C.
D.
36. A truck has to tip materials into a trench. Who should give signals to the truck driver?
A.
B.
C.
D.
37. What is the maximum permitted gap between the guard-rails on a working platform?
A.
B.
C.
D.
38. Which of the following is not a good reason for obtaining and communicating information on construction health risks?
A.
B.
C.
D.
39. While observing an excavator digging a trial pit you notice that liquid is dripping and forming a small pool under the back of the machine. What could this mean?
A.
B.
C.
D.
40. A worker is using a wheelbarrow to move a heavy load. Is this manual handling?
A.
B.
C.
D.
41. How should access be controlled, if people are working in a riser shaft?
A.
B.
C.
D.
42. When planning work on an electrical system, what is the best way to ensure a circuit remains isolated?
A.
B.
C.
D.
43. Which of the following has the highest priority under the hierarchy of control?
A.
B.
C.
D.
44. Who should you inform if someone reports to you that they have work-related hand-arm vibration syndrome (HAVS)?
A.
B.
C.
D.
45. Where are workers likely to breathe in the highest quantities of dust when drilling, cutting, sanding or grinding?
A.
B.
C.
D.
46. Operatives using machinery that can cause vibration are less likely to suffer from hand-arm vibration syndrome (HAVS) if they feel which of the following?
A.
B.
C.
D.
47. Which checks should the operator of a mobile elevating work platform (MEWP) (for example, a cherry picker) carry out before using it?
A.
B.
C.
D.
48. What is a common example of a fragile roof material?
A.
B.
C.
D.
49. From a safety point of view, which of the following should be considered first when deciding on the number and location of access and egress points to a site?
A.
B.
C.
D.
50. If a doctor gives an employee some medication, what should the employee ask the doctor?
A.
B.
C.
D.

 

Whats invloved in the CSCS Test for Managers (MAP)

The CSCS test for managers, also known as the Management and Professional (MAP) Test , is designed to assess an individual's knowledge and understanding of health and safety in the construction industry. The test covers a range of topics, including:

  • General health and safety principles
  • Risk assessment and control measures
  • Fire safety
  • Manual handling
  • Personal protective equipment
  • Working at heights
  • Electrical safety
  • Environmental protection
  • First aid
  • Welfare facilities and provisions
  • Health and safety law

The CSCS test for managers consists of 50 multiple-choice questions, and applicants must answer at least 47 of them correctly to pass the test. The test is taken online, and applicants have 45 minutes to complete it. A CSCS card will be issued to individuals who pass the test, which allows them to work as managers in the construction industry.

Click on a star to rate it!

Average rating 4.7 / 5. 145

No votes so far! Be the first to rate this post.

Why Not Try Out These Tests Next

Leave a Reply to Frederick Farray Cancel reply

Your email address will not be published. Required fields are marked *

64 comments on “CSCS Mock Test For Managers and Professionals”

  1. I checked with the official app. The answer to this question is wrong:
    Which two of these activities are likely to need a hot-work permit?

    The correct answer shouldn't include:
    "Refuelling a diesel dump truck"

    1. Hi Dyl

      Thanks for the heads up, you are completely right! Not sure how this got mixed up on the results, but thank you for letting us know. This has now been corrected

  2. Excellent mock test. It helped to emphasize the importance of reading the question

  3. Great help. I want to donate towards this useful service but won't use email banking. If there's any other way to contribute I will certainly.

  4. What a great site. Really helpful in letting you gauge your knowledge level. Especially nice is that you can see where you have gone wrong and learn from mistakes

  5. Shows the importance of reading the questions fully, before answering, and not rushing to finish.

  6. These mock test are a real help, when sitting the test, you are not made aware of why you got a question wrong this is most frustrating not to under stand your error.

  7. it is really helpful
    most of these question are in actual exam
    Thank you

  8. Very good, my revision was based on the 2016 CITB booklet and all the areas of the mock were covered within it. I advise anyone to obtain the latest version of the booklet before attempting this exam.

  9. Q28 28. A. Which of these statements about personal protective equipment (PPE) is not true?
    A. Workers must use it as instructed
    B. Workers must report any damage or loss to their manager
    C. Workers must store it correctly when they are not using it
    D. Workers must pay for any damage or loss
    I answered D and it says I got it wrong?

ConstructionExam.co.uk is not associated or part of any scheme
or organisation such as the CSCS, CPCS or CITB. The only intention of this website is to
provide information about these schemes and their assessments.
? linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram