Welcome to our Free CSCS Mock Test For Managers and Professionals. If you are working on a construction site in a managerial role, you will have to take this test to get hold of your card, for example, the CSCS Black Managers card and the Academically or Professionally Qualified person cards.

We have included a wide range of questions in this test, there are over 450 questions selected at random to provide you with a 50-question managers CSCS card mock test. So please take this a few times so you can view the different questions and answers.

The managers and professionals CSCS is the same length as the CSCS test for Operatives, it is 45 minutes long, but you will need to score at least 46 out of 50 to pass the exam. There is a larger bank of questions to revise and 3 extra categories to learn:

CSCS Mock Test for Managers and Professionals

If you want to work on a construction site and gain your black card, then you will need to have a good understanding of these questions as you will be asked questions on them in the real exam.

In this mock test, we have provided the latest 50 questions you might be asked when sitting your real CSCS Test. In order to pass your managers and professionals test, you will need to score at least 46 out of 50 correct answers in 45 minutes.

1. How should site visitors be informed of what to do in the event of an on-site emergency?
A.
B.
C.
D.
2. Under the Construction (Design and Management) Regulations 2015, in which of the following situations would a principal contractor need to focus on good contractor co-operation?
A.
B.
C.
D.
3. When asbestos material is suspected in buildings to be demolished, what is the first priority?
A.
B.
C.
D.
4. When should you wear safety footwear on site?
A.
B.
C.
D.
5. What is the least reliable source of information when assessing the level of vibration from a powered percussive hand tool?
A.
B.
C.
D.
6. When you walk across the site, what is the best way to avoid an accident with mobile plant?
A.
B.
C.
D.
7. How does tetanus (an infection you can catch from contaminated land or water) get into your body?
A.
B.
C.
D.
8. You become aware that an active bird’s nest has been destroyed on your site. Which of the following is a possible outcome?
A.
B.
C.
D.
9. What are green and white signs? E004 Emergency Telephone 1
A.
B.
C.
D.
10. What should you do if a worker tells you that a guard is missing from a power tool?
A.
B.
C.
D.
11. What does this sign mean? P010 Do Not Touch
A.
B.
C.
D.
12. What does it mean if you see frost around the valve on a liquefied petroleum gas (LPG) cylinder?
A.
B.
C.
D.
13. A scaffold has collapsed and you saw it happen. What should you say when you are asked about the accident?
A.
B.
C.
D.
14. When assessing the risk of land contamination what three areas need to be considered?
A.
B.
C.
D.
E.
15. If you are not trained in first aid, and someone is knocked unconscious, what should you do first?
A.
B.
C.
D.
16. What final element is missing from this simple four point pollution incident response plan? Stop - Contain - Notify - ?
A.
B.
C.
D.
17. In which of the following circumstances would it not be safe to use a cherry picker for working at height?
A.
B.
C.
D.
18. Where are workers likely to breathe in the highest quantities of dust when drilling, cutting, sanding or grinding?
A.
B.
C.
D.
19. What does this sign mean? Fragile Roof
A.
B.
C.
D.
20. When drilling, cutting, sanding or grinding what is the best way to protect your long-term health?
A.
B.
C.
D.
E.
21. And considering what measures to take to protect workers against risks to their health and safety, when should personal protective equipment be considered?
A.
B.
C.
D.
22. If someone has to move a load while they are sitting down, how much can they move safely?
A.
B.
C.
D.
23. How can you see for yourself that attention has been given to simple emergency procedures on site?
A.
B.
C.
D.
24. Under the Construction (Design and Management) Regulations 2015, what is not a duty of the principal contractor when consulting and engaging with workers?
A.
B.
C.
D.
25. While observing an excavator digging a trial pit you notice that liquid is dripping and forming a small pool under the back of the machine. What could this mean?
A.
B.
C.
D.
26. Which of the following can provide a good first impression of how well a site is being run?
A.
B.
C.
D.
27. Which two of the following factors must be considered when providing first-aid facilities on site?
A.
B.
C.
D.
E.
28. A supervisor has been working long hours and their quality of work and attention to detail is decreasing. What health condition could they be showing signs of?
A.
B.
C.
D.
29. Two contract workers arrived on site with a file of generic risk assessments. You are keen for them to start but you know the risk assessments do not take into account the current site specific hazards. What is the best thing to do?
A.
B.
C.
D.
30. What does this sign mean? M008 Wear Safety Footwear
A.
B.
C.
D.
31. On the site electrical distribution system, which colour plug indicates a 400 volt supply?
A.
B.
C.
D.
32. Why is it important for all workers to attend site induction?
A.
B.
C.
D.
33. Which of the following has the highest priority under the hierarchy of control?
A.
B.
C.
D.
34. A skip-lorry driver hands you a copy of the hazardous waste consignment note with Section C (carrier’s details) signed. If you are responsible for the waste, what is the first thing you need to do with it?
A.
B.
C.
D.
35. A member of the public has been injured by work activities and taken to hospital for treatment. What should happen next?
A.
B.
C.
D.
36. Why might a brownfield site be affected by contaminated land? Select two answers.
A.
B.
C.
D.
E.
37. When do the Construction (Design and Management) Regulations 2015 require a supported or battered excavation to be inspected?
A.
B.
C.
D.
38. Under the Construction (Design and Management) Regulations 2015, which of the following documents must the principal contractor and contractor keep under review?
A.
B.
C.
D.
39. A worker has been asked to move a load that might be too heavy for them. They cannot divide it into smaller parts and there is no-one to help them. What should you do?
A.
B.
C.
D.
40. How can a contractor ensure that the sequence of operations to enable a lift to be carried out safely is in place?
A.
B.
C.
D.
41. What should the site manager do to increase the safety of private motorists if transport leaving site is likely to deposit mud on the public road?
A.
B.
C.
D.
42. When observing the use of oxyacetylene-welding equipment, how should the bottles be positioned?
A.
B.
C.
D.
43. Which of these is not a hazard in a confined space?
A.
B.
C.
D.
44. Why must a residual current device (RCD) be used in conjunction with 230 volt electrical equipment?
A.
B.
C.
D.
45. How must signs on footways be located?
A.
B.
C.
D.
46. When is it safe to use a mobile elevating work platform (MEWP) on soft ground?
A.
B.
C.
D.
47. When work is being carried out above public areas what should be your first consideration?
A.
B.
C.
D.
48. After exposure to lead, what precautions should you take before eating or drinking?
A.
B.
C.
D.
49. What type of eye protection do workers need to wear when they are using a cartridge-operated tool or compressed gas tool (for example, a nail gun)?
A.
B.
C.
D.
50. If you are working in a confined space and notice the smell of rotten eggs, what is this a sign of?
A.
B.
C.
D.

 

Whats invloved in the CSCS Test for Managers (MAP)

The CSCS test for managers, also known as the Management and Professional (MAP) Test , is designed to assess an individual's knowledge and understanding of health and safety in the construction industry. The test covers a range of topics, including:

  • General health and safety principles
  • Risk assessment and control measures
  • Fire safety
  • Manual handling
  • Personal protective equipment
  • Working at heights
  • Electrical safety
  • Environmental protection
  • First aid
  • Welfare facilities and provisions
  • Health and safety law

The CSCS test for managers consists of 50 multiple-choice questions, and applicants must answer at least 47 of them correctly to pass the test. The test is taken online, and applicants have 45 minutes to complete it. A CSCS card will be issued to individuals who pass the test, which allows them to work as managers in the construction industry.

Click on a star to rate it!

Average rating 4.7 / 5. 145

No votes so far! Be the first to rate this post.

Why Not Try Out These Tests Next

Leave a Reply to dennis Cancel reply

Your email address will not be published. Required fields are marked *

64 comments on “CSCS Mock Test For Managers and Professionals”

  1. I checked with the official app. The answer to this question is wrong:
    Which two of these activities are likely to need a hot-work permit?

    The correct answer shouldn't include:
    "Refuelling a diesel dump truck"

    1. Hi Dyl

      Thanks for the heads up, you are completely right! Not sure how this got mixed up on the results, but thank you for letting us know. This has now been corrected

  2. Excellent mock test. It helped to emphasize the importance of reading the question

  3. Great help. I want to donate towards this useful service but won't use email banking. If there's any other way to contribute I will certainly.

  4. What a great site. Really helpful in letting you gauge your knowledge level. Especially nice is that you can see where you have gone wrong and learn from mistakes

  5. Shows the importance of reading the questions fully, before answering, and not rushing to finish.

  6. These mock test are a real help, when sitting the test, you are not made aware of why you got a question wrong this is most frustrating not to under stand your error.

  7. it is really helpful
    most of these question are in actual exam
    Thank you

  8. Very good, my revision was based on the 2016 CITB booklet and all the areas of the mock were covered within it. I advise anyone to obtain the latest version of the booklet before attempting this exam.

  9. Q28 28. A. Which of these statements about personal protective equipment (PPE) is not true?
    A. Workers must use it as instructed
    B. Workers must report any damage or loss to their manager
    C. Workers must store it correctly when they are not using it
    D. Workers must pay for any damage or loss
    I answered D and it says I got it wrong?

ConstructionExam.co.uk is not associated or part of any scheme
or organisation such as the CSCS, CPCS or CITB. The only intention of this website is to
provide information about these schemes and their assessments.
? linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram