CSCS Mock Test For Managers and Professionals

Written By: Ryan - Admin
Updated on: March 6, 2023

Welcome to our Free CSCS Mock Test For Managers and Professionals. If you are working on a construction site in a managerial role, you will have to take this test to get hold of your card, for example, the CSCS Black Managers card and the Academically or Professionally Qualified person cards.

We have included a wide range of questions in this test, there are over 450 questions selected at random to provide you with a 50-question managers CSCS card mock test. So please take this a few times so you can view the different questions and answers.

The managers and professionals CSCS is the same length as the CSCS test for Operatives, it is 45 minutes long, but you will need to score at least 46 out of 50 to pass the exam. There is a larger bank of questions to revise and 3 extra categories to learn:

CSCS Mock Test for Managers and Professionals

If you want to work on a construction site and gain your black card, then you will need to have a good understanding of these questions as you will be asked questions on them in the real exam.

In this mock test, we have provided the latest 50 questions you might be asked when sitting your real CSCS Test. In order to pass your managers and professionals test, you will need to score at least 46 out of 50 correct answers in 45 minutes.

1. What should you do if someone near you is using noisy equipment and you have no hearing protection?
A.
B.
C.
D.
2. When must employers supply personal protective equipment (PPE)?
A.
B.
C.
D.
3. What are two recommended ways to protect your hearing?
A.
B.
C.
D.
E.
4. What do the COSHH Regulations deal with?
A.
B.
C.
D.
5. When providing showers for male and female workers, which is the preferred option?
A.
B.
C.
D.
6. When must you wear hi-vis (high-visibility) clothing?
A.
B.
C.
D.
7. Under the Construction (Design and Management) Regulations 2015, who is responsible for notifying the relevant enforcing authority when a project is notifiable?
A.
B.
C.
D.
8. Which of these is the least likely to cause skin problems?
A.
B.
C.
D.
9. Which of the following provides health and safety information about a hazardous substance?
A.
B.
C.
D.
10. What must a travelling first-aid kit not contain?
A.
B.
C.
D.
11. What should a contractor do if they discover underground services not previously identified?
A.
B.
C.
D.
12. When can a mobile plant operator let people ride in, or on, the machine?
A.
B.
C.
D.
13. Your workers have been face-fit tested. What is one of the checks you can make to ensure their mask provides a tight seal?
A.
B.
C.
D.
14. The programme of works you are managing has run behind and you will need the site to be operational on a Sunday. The operations will be noisy and there are nearby residents. What action should you take before working?
A.
B.
C.
D.
15. What does this sign mean? E002 Emergency Exit Right Hand
A.
B.
C.
D.
16. As a result of risk assessment, work is to be carried out under a hot-work permit. What must the permit specify?
A.
B.
C.
D.
17. What is the legal duty of the site manager when an invasive species of plant, such as Japanese knotweed, is discovered on site?
A.
B.
C.
D.
18. You are standing near a deep trench. A lorry backs up to the trench and the engine is left running. What should you do?
A.
B.
C.
D.
19. If there are any doubts about a building’s stability, whom should a demolition contractor consult?
A.
B.
C.
D.
20. What must all workers do under the regulations for manual handling?
A.
B.
C.
D.
21. If you think someone has broken their leg, what should you do?
A.
B.
C.
D.
22. What must edge protection be designed to do?
A.
B.
C.
D.
23. An excavator on site has overturned but no one was injured. What must have a next?
A.
B.
C.
D.
24. Which of the following is most likely to result in those who work with sheet lead having raised levels of lead in their blood?
A.
B.
C.
D.
25. If an assessment has been carried out under the COSHH Regulations who should the risks and control measures be explained to?
A.
B.
C.
D.
26. Why is it important to be clean shaven if using a half-mask respirator?
A.
B.
C.
D.
27. What does this sign mean? M008 Wear Safety Footwear
A.
B.
C.
D.
28. What does this sign mean? M007 Opaque Eye Protection Must Be Worn
A.
B.
C.
D.
29. What does a risk assessment tell you?
A.
B.
C.
D.
30. Under the Construction (Design and Management) Regulations 2015, which two of the following must be in place before work begins on site?
A.
B.
C.
D.
E.
31. A mobile elevating work platform (MEWP) on your site, used for lifting people, should be thoroughly examined by a competent person at intervals not exceeding how many months?
A.
B.
C.
D.
32. In the colour coding of electrical power supplies on site, what voltage does a blue plug represent?
A.
B.
C.
D.
33. What is a near miss?
A.
B.
C.
D.
34. What is the best way to protect an extension cable and also reduce trip hazards?
A.
B.
C.
D.
35. Under the Construction (Design and Management) Regulations 2015, who must plan, manage and monitor health and safety during the construction phase on projects with more than one contractor?
A.
B.
C.
D.
36. Which checks should the operator of a mobile elevating work platform (MEWP) (for example, a cherry picker) carry out before using it?
A.
B.
C.
D.
37. What is the maximum unprotected gap allowed between any guard-rail, toe board, barrier or other similar means of protection on a scaffold?
A.
B.
C.
D.
38. Who should you inform if someone reports to you that they have work-related hand-arm vibration syndrome (HAVS)?
A.
B.
C.
D.
39. A whole site has been issued with a probation notice. what does this mean during the period that the notice applies?
A.
B.
C.
D.
40. If someone has fallen from height and has no feeling in their legs, what should you do?
A.
B.
C.
D.
41. When should you wear safety footwear on site?
A.
B.
C.
D.
42. What is the preferred method of checking for leaks when assembling liquefied petroleum gas (LPG) equipment before use?
A.
B.
C.
D.
43. What type of eye protection do workers need to wear when they are using a cartridge-operated tool or compressed gas tool (for example, a nail gun)?
A.
B.
C.
D.
44. What should the capacity of a spillage bund around a fuel storage tank be, in addition to the volume of the tank?
A.
B.
C.
D.
45. Where are workers likely to breathe in the highest quantities of dust when drilling, cutting, sanding or grinding?
A.
B.
C.
D.
46. The easiest way to the place you want to be on site is through a contractor’s vehicle compound. Which route should you take?
A.
B.
C.
D.
47. If someone working in a deep inspection chamber has collapsed, what should you do first?
A.
B.
C.
D.
48. A foam extinguisher, identified by a cream band, should not be used on what type of fire?
A.
B.
C.
D.
49. Under environmental law, which statement is true?
A.
B.
C.
D.
50. What action should be taken before using a scaffold which is secured by masonry anchor ties?
A.
B.
C.
D.

 

Whats invloved in the CSCS Test for Managers (MAP)

The CSCS test for managers, also known as the Management and Professional (MAP) Test , is designed to assess an individual's knowledge and understanding of health and safety in the construction industry. The test covers a range of topics, including:

  • General health and safety principles
  • Risk assessment and control measures
  • Fire safety
  • Manual handling
  • Personal protective equipment
  • Working at heights
  • Electrical safety
  • Environmental protection
  • First aid
  • Welfare facilities and provisions
  • Health and safety law

The CSCS test for managers consists of 50 multiple-choice questions, and applicants must answer at least 47 of them correctly to pass the test. The test is taken online, and applicants have 45 minutes to complete it. A CSCS card will be issued to individuals who pass the test, which allows them to work as managers in the construction industry.

Click on a star to rate it!

Average rating 4.7 / 5. 145

No votes so far! Be the first to rate this post.

Why Not Try Out These Tests Next

Leave a Reply to Lax Cancel reply

Your email address will not be published. Required fields are marked *

64 comments on “CSCS Mock Test For Managers and Professionals”

  1. I checked with the official app. The answer to this question is wrong:
    Which two of these activities are likely to need a hot-work permit?

    The correct answer shouldn't include:
    "Refuelling a diesel dump truck"

    1. Hi Dyl

      Thanks for the heads up, you are completely right! Not sure how this got mixed up on the results, but thank you for letting us know. This has now been corrected

  2. Excellent mock test. It helped to emphasize the importance of reading the question

  3. Great help. I want to donate towards this useful service but won't use email banking. If there's any other way to contribute I will certainly.

  4. What a great site. Really helpful in letting you gauge your knowledge level. Especially nice is that you can see where you have gone wrong and learn from mistakes

  5. Shows the importance of reading the questions fully, before answering, and not rushing to finish.

  6. These mock test are a real help, when sitting the test, you are not made aware of why you got a question wrong this is most frustrating not to under stand your error.

  7. it is really helpful
    most of these question are in actual exam
    Thank you

  8. Very good, my revision was based on the 2016 CITB booklet and all the areas of the mock were covered within it. I advise anyone to obtain the latest version of the booklet before attempting this exam.

  9. Q28 28. A. Which of these statements about personal protective equipment (PPE) is not true?
    A. Workers must use it as instructed
    B. Workers must report any damage or loss to their manager
    C. Workers must store it correctly when they are not using it
    D. Workers must pay for any damage or loss
    I answered D and it says I got it wrong?

ConstructionExam.co.uk is not associated or part of any scheme
or organisation such as the CSCS, CPCS or CITB. The only intention of this website is to
provide information about these schemes and their assessments.
? linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram